Earned Value Management Specialist
Open to people in the United States
“ProSidian Seeks a Earned Value Management Specialist | Construction Engineering & Monitoring Support [DOE0027027] for Program Support on a Exempt 1099 Contract: No Overtime Pay Basis Remote (within USA - W/ On-Site Meetings Expected) in ...”
From the employer’s posting.
Checked 59 minutes ago on ProSidian Consulting’s own careers page. Not open to you after all? .
About the job
From ProSidian Consulting’s job posting.
ProSidian is a Management and Operations Consulting Services firm that delivers value to clients through tailored solutions grounded in industry-leading practices. ProSidian provides enterprise services/solutions for Risk Management, Compliance, Business Process, IT Effectiveness, Engineering, Environmental, Sustainability, and Human Capital. We help forward-thinking clients solve problems and improve operations.  Launched by Management Consultants, our multidisciplinary teams bring together the talents of global professionals to complete a wide range of engagements for public and private, defense and civilian government, and non-profit organizations.  Our solution-centric services are deployed across the enterprise, target drivers of economic profit (growth, margin, and efficiency), and are aligned at the intersections of assets, processes, policies, and people delivering value. Learn More About ProSidian Consulting at www.ProSidian.com.
ProSidian Seeks a Earned Value Management Specialist | Construction Engineering & Monitoring Support [DOE0027027] for Program Support on a Exempt 1099 Contract: No Overtime Pay Basis Remote (within USA - W/ On-Site Meetings Expected) in The CONUS - Located In Washington, DC / Nationwide (Remote Project Support Across the United States) Area Clearance Designation(s): STD Background Chk Contract Contingent, generally located across the CONUS - Located In Washington, DC / Nationwide (Remote Project Support Across the United States) Across The District of Columbia / Nationwide (Remote Project Support Across the United States) - Independent Engineering Advisory Services are typically performed remotely and at project sites nationwide. Region supporting a a department within the US Department of Energy [The Loan Programs Office (LPO)] that provides attractive debt financing for high-impact, large-scale energy infrastructure projects in the United States.
The Earned Value Management Specialist | Construction Engineering & Monitoring Support [DOE0027027] is aligned with GSA Labor Category: Senior Consultant.
We seek Earned Value Management Specialist | Construction Engineering & Monitoring Support [DOE0027027] candidates with relevant Energy Industry (Oil, And Gas/Power, And Utilities) Sector Experience (functional and technical area expertise also ideal) to support professional services engagement for Energy Industry (Oil, And Gas/Power, And Utilities) Sector Clients such as DOE.
JOB OVERVIEW
Provide services and support as a Earned Value Management Specialist [Independent Engineering (IE) Advisory Services] aligned with the Construction Engineering & Monitoring Support Functional Area / Swim Lane / Category Discipline in the Energy Industry (Oil, And Gas/Power, And Utilities) Industry Sector focussing on RM | Risk Management Solutions for clients such as U.S. Department of Energy (DOE) | DOE Energy Dominance Financing (EDF) Program Generally Located In CONUS - Located In Washington, DC / Nationwide (Remote Project Support Across the United States) and across the District of Columbia / Nationwide (Remote Project Support Across the United States) - Independent Engineering Advisory Services are typically performed remotely and at project sites nationwide. Region (Of Country/World) Remote (within USA - W/ On-Site Meetings Expected).
 Serves as a Earned Value Management Specialist within the Construction Engineering & Monitoring Support swim lane, delivering bankable, technically defensible Independent Engineering advisory services by converting discipline-specific engineering, construction, compliance, operating, commercial, and risk findings into lender-ready due diligence, monitoring, certification, and decision-support outputs.
Serve as a Earned Value Management Specialist - Construction Engineering & Monitoring Support Specialist (Labor Category: Senior Consultant II) to provide Construction Engineering & Monitoring Support Operations / Compliance as part of an as part of an Independent Engineering (IE) Advisory Services | Energy Dominance Financing (EDF) Advisory / Technical Due Diligence / Credit Evaluation / Lifecycle Monitoring Team that provides Management and Financial Consulting, Acquisition and Grants Management Support, and Business Program and Project Management Services.  This includes activities that address and Performance measurement and forecasting: Measures cost and schedule performance, progress curves, earned value metrics, and forecast variances.
RESPONSIBILITIES AND DUTIES - Earned Value Management Specialist | Construction Engineering & Monitoring Support [DOE0027027]
Provides Independent Engineering advisory support for Energy Dominance Financing (EDF) Program technical due diligence, credit evaluation, lifecycle monitoring, and assurance activities, with emphasis on earned value, baseline performance, cost and schedule variance, and forecast-to-complete metrics. Reviews project documentation, evaluates technical and commercial interfaces, identifies risks and mitigations, validates assumptions, supports conditions precedent and disbursement readiness reviews where applicable, and prepares defensible work products including EV reports, CPI/SPI trends, baseline change review, and project controls dashboards. Coordinates with engineering, finance, legal, construction, operations, environmental, HSE, and project controls stakeholders to support timely lender and DOE decision-making.
The role(s) are located in the District of Columbia / Nationwide (Remote Project Support Across the United States) - Independent Engineering Advisory Services are typically performed remotely and at project sites nationwide. Region, at or near CONUS - Located In Washington, DC / Nationwide (Remote Project Support Across the United States).  Initially identified Work Site Address (Remote (within USA - W/ On-Site Meetings Expected):  1000 Independence Avenue SW, Washington, DC 20585
ProSidian Seeks a Earned Value Management Specialist | Construction Engineering & Monitoring Support [DOE0027027] for Program Support on a Exempt 1099 Contract: No Overtime Pay Basis Remote (within USA - W/ On-Site Meetings Expected) in The CONUS - Located In Washington, DC / Nationwide (Remote Project Support Across the United States) Area Clearance Designation(s): STD Background Chk Contract Contingent, generally located across the CONUS - Located In Washington, DC / Nationwide (Remote Project Support Across the United States) Across The District of Columbia / Nationwide (Remote Project Support Across the United States) - Independent Engineering Advisory Services are typically performed remotely and at project sites nationwide. Region supporting a a department within the US Department of Energy [The Loan Programs Office (LPO)] that provides attractive debt financing for high-impact, large-scale energy infrastructure projects in the United States.
The Earned Value Management Specialist | Construction Engineering & Monitoring Support [DOE0027027] is aligned with GSA Labor Category: Senior Consultant.
We seek Earned Value Management Specialist | Construction Engineering & Monitoring Support [DOE0027027] candidates with relevant Energy Industry (Oil, And Gas/Power, And Utilities) Sector Experience (functional and technical area expertise also ideal) to support professional services engagement for Energy Industry (Oil, And Gas/Power, And Utilities) Sector Clients such as DOE.
JOB OVERVIEW
Provide services and support as a Earned Value Management Specialist [Independent Engineering (IE) Advisory Services] aligned with the Construction Engineering & Monitoring Support Functional Area / Swim Lane / Category Discipline in the Energy Industry (Oil, And Gas/Power, And Utilities) Industry Sector focussing on RM | Risk Management Solutions for clients such as U.S. Department of Energy (DOE) | DOE Energy Dominance Financing (EDF) Program Generally Located In CONUS - Located In Washington, DC / Nationwide (Remote Project Support Across the United States) and across the District of Columbia / Nationwide (Remote Project Support Across the United States) - Independent Engineering Advisory Services are typically performed remotely and at project sites nationwide. Region (Of Country/World) Remote (within USA - W/ On-Site Meetings Expected).
 Serves as a Earned Value Management Specialist within the Construction Engineering & Monitoring Support swim lane, delivering bankable, technically defensible Independent Engineering advisory services by converting discipline-specific engineering, construction, compliance, operating, commercial, and risk findings into lender-ready due diligence, monitoring, certification, and decision-support outputs.
Serve as a Earned Value Management Specialist - Construction Engineering & Monitoring Support Specialist (Labor Category: Senior Consultant II) to provide Construction Engineering & Monitoring Support Operations / Compliance as part of an as part of an Independent Engineering (IE) Advisory Services | Energy Dominance Financing (EDF) Advisory / Technical Due Diligence / Credit Evaluation / Lifecycle Monitoring Team that provides Management and Financial Consulting, Acquisition and Grants Management Support, and Business Program and Project Management Services.  This includes activities that address and Performance measurement and forecasting: Measures cost and schedule performance, progress curves, earned value metrics, and forecast variances.
RESPONSIBILITIES AND DUTIES - Earned Value Management Specialist | Construction Engineering & Monitoring Support [DOE0027027]
Provides Independent Engineering advisory support for Energy Dominance Financing (EDF) Program technical due diligence, credit evaluation, lifecycle monitoring, and assurance activities, with emphasis on earned value, baseline performance, cost and schedule variance, and forecast-to-complete metrics. Reviews project documentation, evaluates technical and commercial interfaces, identifies risks and mitigations, validates assumptions, supports conditions precedent and disbursement readiness reviews where applicable, and prepares defensible work products including EV reports, CPI/SPI trends, baseline change review, and project controls dashboards. Coordinates with engineering, finance, legal, construction, operations, environmental, HSE, and project controls stakeholders to support timely lender and DOE decision-making.
The role(s) are located in the District of Columbia / Nationwide (Remote Project Support Across the United States) - Independent Engineering Advisory Services are typically performed remotely and at project sites nationwide. Region, at or near CONUS - Located In Washington, DC / Nationwide (Remote Project Support Across the United States).  Initially identified Work Site Address (Remote (within USA - W/ On-Site Meetings Expected):  1000 Independence Avenue SW, Washington, DC 20585
Desired Qualifications For Earned Value Management Specialist | Construction Engineering & Monitoring Support [DOE0027027] Candidates:
10+ years of relevant engineering, construction, operations, compliance, risk, finance, or energy infrastructure advisory experience; demonstrated work on oil and gas, power, utilities, or large-scale infrastructure projects for owners, lenders, independent engineers, or federal clients.
Education / Experience Requirements / Qualifications
Bachelor's degree in engineering, environmental science, construction management, business, risk management, finance, or related field. Relevant certifications such as PMP, CQA, CIA, ISO Lead Auditor, CHMM, CSP, or PMI-RMP preferred.
10+ years of relevant engineering, construction, operations, compliance, risk, finance, or energy infrastructure advisory experience; demonstrated work on oil and gas, power, utilities, or large-scale infrastructure projects for owners, lenders, independent engineers, or federal clients.
Skills Required
Primarily focused on Management and Financial Consulting, Acquisition and Grants Management Support, and Business Program and Project Management Services initiatives and aligned with Program Support activities Construction Engineering & Monitoring Support Functional Area Activities. 
Independent engineering review; U.S. Department of Energy (DOE) Loan Programs Office (LPO) - Style documentation discipline; technical due diligence; risk assessment; earned value, baseline performance, cost and schedule variance, and forecast-to-complete metrics; data room review; information request tracking; report writing; Excel-based analysis; stakeholder coordination; and clear presentation of findings for credit, construction, monitoring, and certification decisions.
Competencies Required
Technical judgment; independence and objectivity; analytical rigor; attention to detail; defensible documentation; client service orientation; cross-functional collaboration; issue escalation; quality mindset; schedule discipline; and ability to translate technical evidence into actionable risk, compliance, and financing implications.
Ancillary Details Of The Roles
Ancillary role detail: may participate in data room reviews, borrower/contractor interviews, site observations, monthly monitoring meetings, risk register updates, CP evidence reviews, draw package checks, issue closure tracking, and preparation of Independent Engineer reports for DOE, LPO, credit, and program governance stakeholders.
The DOE Energy Dominance Financing (EDF) Program represents DOE/LPO-supported financing and lifecycle oversight activities for large-scale U.S. energy infrastructure projects, requiring independent engineering, technical due diligence, credit evaluation, construction monitoring, operational performance assessment, and risk management services to support financing decisions and protect government lending interests throughout the project lifecycle.  DOE financing activities that support U.S. energy infrastructure, energy security, domestic production, and strategic energy investments. The financing authority itself would typically be administered through the DOE Loan Programs Office (LPO).
The Loan Programs Office (LPO) is the financing arm of the U.S. Department of Energy, responsible for providing Direct loans, loan guarantees, credit assistance, and project finance support for large-scale energy and infrastructure projects in the United States.  The LPO evaluates projects from Technical, Engineering, Financial, Commercial, Environmental, Regulatory, Construction, and Operational perspectives before financing decisions are made. 
Independent Engineering (IE) Advisory Services are needed for complex energy projects. DOE/LPO frequently requires independent technical reviews similar to those used by commercial lenders, export credit agencies, multilateral development banks, and institutional project finance investors.  An EDF-style Independent Engineering engagement could include:
- Upstream Oil & Gas (Exploration and production | Reservoir development | Drilling programs)
- Midstream (Pipelines | Compression facilities | LNG infrastructure | Storage terminals)
- Downstream (Refineries | Petrochemical facilities | Processing plants)
- Power & Utilities (Generation facilities | Transmission infrastructure | Grid modernization | Energy storage)
Other Details
Role supports NAICS 541330 Engineering Services for Energy Dominance Financing (EDF) Program/Loan Programs Office (LPO) energy infrastructure financing, with work performed for high-impact oil and gas, power, utilities, and infrastructure projects.
That’s the first part of a longer posting. The rest is on ProSidian Consulting’s own page, which Apply opens for you.
More from ProSidian Consulting
-
International Development Program Communications Specialist (PILAB013)
ProSidian ConsultingMid-levelMarketing
Location: “Remote; Washington, DC, United States”
Open to people in the United States
-
International Development Program/Project Training and Development Specialist (PILAB012)
ProSidian ConsultingMid-levelOther
Location: “Remote; Washington, DC, United States”
Open to people in the United States
-
International Development Program/Project Data Analyst (PILAB011)
ProSidian ConsultingMid-levelData and AI
Location: “Remote; Washington, DC, United States”
Open to people in the United States
-
Lead International Development Program/Project Evaluator (PILAB010)
ProSidian ConsultingLead and principalOther
Location: “Remote; Washington, DC, United States”
Open to people in the United States
-
International Development Program/Project Manager (PILAB009)
ProSidian ConsultingMid-levelProduct
Location: “Remote; Washington, DC, United States”
Open to people in the United States